We're testing a new way to do online services. Visit beta.orlando.gov - use it and tell us what you think!

Key Municipal Planning Board Items

These items are scheduled to go before the Municipal Planning Board (MPB) on March 19, 2019. Please check back periodically for links to the individual staff reports.   The list of cases being heard by the MPB changes often, with projects being deferred, withdrawn, etc.  Prior to the meeting, you can contact Lourdes Diaz at lourdes.diaz@cityoforlando.net or 407.246.3365 to confirm if the case is scheduled for this month’s meeting.

CONSENT AGENDA

Project Name:      ADDISON @ GATEWAY APARTMENTS
Case Address:       
7200 N. Frontage Rd., west of N. Frontage Rd. and east of Shadowridge Dr. (+10.8 acres).
MPL2019-10000  Master Plan request for the development of a 323-unit multi-family apartment complex in
the Orlando Gateway/Airport North neighborhood.

Project Name:      2018 GROWTH INDICATORS REPORT
Case Address:
        Citywide
GMP2019-10001   Annual report to provide 2018 growth indicators as required by GMP Future Land Use Policy 1.5.1.

Project Name:     SIDEWALKS – CITY CODE REVISIONS
Case Address: 
     Citywide
LDC2019-10001  This revision will remove the regulations for sidewalk installation from Chapter 61 and Chapter 64 of the Land Development Code to Chapter 54, Article 3. Updates to Code will include: addition of a second level of appeal for decisions regarding sidewalk construction; clarification of where and when sidewalks must be constructed, addition of ADA standards as a consideration for sidewalk construction; definition on where funds paid in lieu of sidewalk construction may be spent; and updates and clarification of the cost calculations for funds paid in lieu of construction.

REGULAR AGENDA

Project Name:      TREE PRESERVATION UPDATES TO THE LAND DEVELOPMENT CODE
Case Address: 
      Citywide
LDC2018-10019     Updates to the Land Development Code in regards to tree preservation efforts including: References in code to specific tree diameters, appeals process for tree removal/encroachment permits; submittal requirements in regards to tree surveys and
tree preservation plans; and clarifying exceptions when alternative review conditions and requirements may be applied.